Coverage by Ton or Yard
All calculations are based on 1 cubic yard at the depths listed.
| Depth | #9 Lime | #10 Lime | #57 Lime | #411 Lime | #8 Gravel | #57 Gravel | #34 Gravel | Topsoil | Mulch |
| 1″ | 338 | 338 | 338 | 338 | 293 | 338 | 338 | 270 | 300 |
| 2″ | 159 | 159 | 159 | 159 | 146 | 159 | 159 | 135 | 159 |
| 3″ | 108 | 108 | 108 | 108 | 94 | 108 | 108 | 87 | 100 |
| 4″ | 82 | 82 | 82 | 82 | 73 | 82 | 82 | 66 | 75 |
| 5″ | 64 | 64 | 64 | 64 | 59 | 64 | 64 | 52 | 60 |
| 6″ | 54 | 54 | 54 | 54 | 45 | 54 | 54 | 44 | 49 |
| 7″ | 47 | 47 | 47 | 47 | 47 | 47 | 38 | 43 |
All calculations are based on 1 ton at the depths listed.
| Depth | Grit#10 | #8 | #57 | #4 | #1&2 |
| 1″ | 240 | 293 | 338 | 271 | 250 |
| 2″ | 115 | 146 | 168 | 140 | 124 |
| 3″ | 70 | 94 | 108 | 90 | 80 |
| 4″ | 58 | 73 | 84 | 70 | 62 |
| 5″ | 46 | 59 | 65 | 56 | 50 |
| 6″ | 38 | 45 | 54 | 45 | 40 |
Formulas
Cubic Yardage = Length in feet x Width in feet x Depth in feet (inches divided by 12). Take the total and divide by 27 (the amount of cubic feet in a yard).
Tonnage = yards x 1.4 (for aggregates)



Calculators
Rectangle Calculator
Circle Calculator
Triangle Calculator
Hardscape Calculations
Solider & Sailor Course
P = Perimeter | L = Lenth (long side of paver) |W = Width (short side of paver)
Solider Course = (P*12) / W = How many pieces needed